Select a link :

( NEW WORKS )

  • Designed and Built at a cost of RM 220 Million
Pre-completed Cinta Mata WTW site.
Cinta Mata WTW site was opened by Prime Minister Datuk Seri Dato Mahathir bin Mohamad.
  • Original Design Capacity - 40MLD
  • Increased Capacity to 60MLD
  • May 1995 to 1997

| Constructions | Latest Technology | Introduction |

go top


Powered by Scadex Technologies